Categories: Events

Boston rally to stop Line 3, Aug. 25

WEDNESDAY, AUGUST 25, 2021 AT 6 PM EDT – 7:30 PM EDT
Boston Rally to Stop Line 3
507 Jamaicaway, Jamaica Plain, MA 02130

Join us at Jamaica Pond at 6pm to rally in solidarity with the Indigenous-led movement against the construction of the Line 3 tar sands pipeline. We will be holding a rally and vigil to honor the wild rice, treaties, and ways of life that are being trampled by corporate greed. We will call on the Biden administration, our so-called “climate president,” to end its hypocrisy and use its power to #StopLine3.

This event is part of nationwide day of action that includes events in Chicago, New York City, Washington D.C., and St. Paul!

Directions: We will be gathering near the Jamaica Pond Boathouse, 507 Jamaicaway, Jamaica Plain, MA 02130.

Cover Photo from @Giniw Collective

Some background:

Construction of Enbridge Corporation’s Line 3 pipeline is in violation of official treaties from 1837, 1854, and 1855 — an illegal invasion and occupation of Anishinaabe land. The pipeline will inevitably contaminate wild rice beds, an important food that is sacred to the Anishinaabe people. The workers who construct the pipeline — living in man camps — solicit sex from minors and contribute to the epidemic of Missing and Murdered Indigenous Relatives, Women, and Two Spirit people.

Indigenous leaders and water protectors have been brutalized by local police, hired by Enbridge, as they have tried to enforce treaty rights and resist construction. Nonviolent demonstrations have been met with rubber bullets, tear gas, non-lethal pain weapons, and much more. This is but a continuation of repressive settler-colonial policy on behalf of the government of the so-called United States against Indigenous people.

Environmentally, the pipeline is a disaster. Enbridge pipelines have spilled over 800 times in 15 years, and the 300,000 people who live downstream of the Mississippi River are at risk. The Line 3 pipeline has already generated 28 frac-outs, where drilling fluid pollutes the rivers. The pipeline’s completion will double Minnesota’s carbon emissions, the equivalent of 50 coal-fired power plants. Tar sands oil, which it will carry, is not the future of energy infrastructure, but a desperate last-ditch effort by a corrupt, entrenched industry whose profit-seeking hurtles the planet and people towards disaster.

Find out more here: https://linktr.ee/stopline3

Struggle - La Lucha

Recent Posts

No tears for Trump!

Gaza is still being bombed! The struggle must go forward  The first question that…

10 hours ago

Haiti and Bastille Day: Tear down the walls!

The pushing back of the fascists in the French election gives new hope for an…

3 days ago

Pacemakers for Cuba, a unique effort to save lives

More than 300 pacemakers will reach Cuban institutions thanks to a campaign in the United…

3 days ago

Puerto Rico: Strike at Switzerland Dairy

In Puerto Rico, being a colony, each of our struggles has several ramifications and consequences.…

3 days ago

Western Yemen comes under heavy attack by U.S.-British warplanes

A violent and illegal bombing campaign on Yemen by the U.S. and Britain has failed…

3 days ago

U.S. war games in Pacific seek global participation in imperialist maneuvers

Every two years, the Indo-Pacific Command Center of the United States convenes the largest maritime…

3 days ago